INDUSTRIAL
HEALTHCARE

EDUCATIONAL

GOVERNMENT

COMMERCIAL

INDUSTRIAL

MULTIFAMILY

WORSHIP

COMMISSIONING


Associated Grocers of Florida, Hialeah, FL
Energy analysis and design of capital improvement projects at this 400,000 sq. ft. dry and perishable warehouse facility. Included retrofit of the ammonia refrigeration system.

Chipico Pickle Processing Facility, Palmetto, FL
New 23,000 sq. ft. cold-pack pickle processing facility. Design included refrigeration system design, process piping design, and a special solid waste interceptor system.

Premier Packaging, Miami, FL
New 100,000-square-foot facility for producing and warehousing injection molded polystyrene. Work included a drying tunnel design to reduce the moisture content of the finished product from 3% to near 0%.

Zephyrhills Bottled Water, Zephyrhills, FL
Design of a new blow molding line in the existing plant facility.

Cintas, West Palm Beach, FL
New large commercial laundry facility.

Smith & Nephew, St. Petersburg, FL
Multiple projects for this sterile bandage manufacturing facility. Projects included a new ISO Class 8 cleanroom, a hazardous material storage building, and new corporate offices.

ConMed Linvatec, Largo, FL
23,500 sq. ft. manufacturing renovation and addition for a surgical instrument and medical device manufacturer. Work included precise temperature and humidity control with HEPA filtration.

Eby-Brown Distribution Center, Ypsilanti, MI
Addition to an existing food warehouse with a -20°F freezer, a 0°F freezer, a 36°F cooler and a 36°F dock. Work included halon carbon refrigeration systems, an under floor heating system and double-interlocked dry pipe pre-action sprinkler system.

Catalent Pharma Solutions, St. Petersburg, FL
This market leading pharmaceutical manufactures nearly half of all new drug approvals, specializing in soft gelatin capsules. MES Group provided services for several projects to control exacting temperature and humidity conditions in the plant to support product processing. Plant area is 750,000 sq. ft.