GOVERNMENT
HEALTHCARE

EDUCATIONAL

GOVERNMENT

COMMERCIAL

INDUSTRIAL

MULTIFAMILY

WORSHIP

COMMISSIONING


United States Naval Air Station, Key West, FL
Renovations to the 7,000 sq. ft. Building 4085, Radar Air Traffic Control Center (RATCC). New mass notification Fire Alarm System for building. For 3,000 sq. ft. raised floor data area, demolition of clean agent Fire Suppression System, and installation of double action Fire Suppression System and new water service.

Florida Department of Agriculture, Tallahassee, FL
Energy analysis, life cycle costing and report for over 500,000 sq. ft. of FDA facilities.

Polk County Government, Bartow, FL
Phase I services for an Energy analysis and study of over 1,000,000 sq. ft. for all county facilities. Phase II services included design of energy conservation projects totaling over $7,000,000 of capital improvements.

Hillsborough County Sheriff’s Department, Tampa, FL
Energy analysis, life cycle costing and report for all Sheriff related facilities in the county including Orient Road Jail and Ybor City administration building.

Pinellas County Sheriff’s Office Firing Range, St. Petersburg, FL
23,000 sq. ft. outdoor firing range with control tower, ammo storage and equipment room.

United States Special Operations Command (SOCOM), MacDill AFB, Tampa, FL
New Conference Room in Headquarters Command Suite. All work under SCIF standards.

United States Central Command (CENTCOM), MacDill AFB, Tampa, FL
Prime contractor for the design, engineering and construction phase services to add a 100 ton chiller to the existing central chiller plant of Central Command Headquarters.

United States Botanic Garden Administration Building, Washington, DC
Complex renovation program to replace and update existing MEP systems of this historic site at Bartholdi Park on Capital Hill. Special design guidelines were followed that were administered by the Architect of the Capital.

GSA

Federal Building, Mobile, AL
Study, assessment, analysis, life cycle costing and report for existing systems renovation program. Provided construction documents to implement results from study.

John A. Campbell US Courthouse, Mobile, AL
Replacement of Air Handling units, pumps, VFDs and controls.

Sam M. Gibbons US Courthouse, Tampa, FL
Security area renovations

R.L. Timberlake, Jr. Federal Building, Tampa, FL
Renovation of offices on the second floor for US Health and Human Services Office of the Inspector General.

Peace Creek Fire Station, Polk County FL
Prototype fire station with apparatus rooms, bunk rooms, kitchen and dining areas.

Northeast District Command Center, Davenport, FL
New 30,000 sq. ft. regional command center and sheriff’s substation with offices, fitness, holding area, sally port, kennel, and offices.